Veisiejai Observation Tower, 2014
Complex steel structuresA 15-meter-long steel tower was made and then fully assembled and disassembled at the factory. The tower was hot-dip galvanised and painted with a C4H anti-corrosion coating.
- Client: Raseinių Statyba UAB
- Quantity of materials: 15 metres
- End of work: 09/01/2014