Veisiejai Observation Tower, 2014

Complex steel structures

Project Type:

A 15-meter-long steel tower was made and then fully assembled and disassembled at the factory. The tower was hot-dip galvanised and painted with a C4H anti-corrosion coating.

  • Client: Raseinių Statyba UAB
  • Quantity of materials: 15 metres
  • End of work: 09/01/2014