Meteliai Observation Tower, 2014

Meteliai Observation Tower, 2014 Project Type: Complex steel structures   The steel part of Meteliai Observation Tower, inserts for wooden elements, and a staircase were made. The structures were hot-dip galvanised.During manufacture, the tower was fully assembled and then, before shipping to the site, disassembled.The height of the tower is 15 metres. Client: Raseinių Statyba UAB […]

Iceeignir, Iceland. 2022

Iceeignir, Iceland. 2022 Project Type: Steel structures for buildings   We produced and designed 150 tons of steel structures. The entire structure was modeled, calculated and designed by UAB Butina. A total of 12 containers of production were shipped in 2 months. Client: Iceland Quantity of materials: 150 tons End of work: 08/15/2022

Stapaskoli, Iceland. 2022

Stapaskoli, Iceland. 2022 Project Type: Steel structures for buildings   We produced and designed 110 tons of steel structures. The trusses are divided into 4 parts for the purpose of transporting the products by sea containers, by designing pre-stressed connections. The total length of the span is 40 meters. Client: Iceland Quantity of materials: 110 tons End […]

Bláfjöll­um, Iceland. 2022

Bláfjöll­um, Iceland. 2022 Project Type: Complex steel structuresSteel structures for buildings   We produced 85 tons of steel structures. All structures were hot-dip galvanized, some outdoor structures were additionally painted, reaching C5-M anti-corrosion class. Client: Iceland Quantity of materials: 85 tons End of work: 06/15/2022

Norrkoping, Sweden. 2022

Norrkoping, Sweden. 2022 Project Type: Steel structures for buildings   Manufactured for a 17 ton structural building in Sweden. Client: Sweden Quantity of materials: 17 tons End of work: 06/15/2022

Central Bank, Reykjavik, Iceland. 2023

Central Bank, Reykjavik, Iceland. 2023 Project Type: Steel structures for buildings   • Design and Manufactured 90 tons of steel structures.• Since it was a reconstruction adaptation, we tailored the design for a pre-existing building.• The structures were designed and refined according to the data obtained by the 3D scanner. Client: Iceland Quantity of materials: 90 tons […]